Proof of work: the work ledger, measured impact and proof in reports
The Work ledger that records every piece of work SEOAsist and your team did with its evidence, how estimated times are calculated, how a piece of work's Search Console impact is measured, and the proof sections in reports.
Open this screen in the panelSEOAsist doesn't claim the work it does, it records it. Every piece of work that was actually applied (an opened PR, a rule put live, a published post, a submitted sitemap…) becomes one row in the Work ledger, with its source and evidence. Work that leaves no record or evidence isn't in the ledger. The same records feed the site's Impact tab and your reports.
Opening the work ledger
- Open Settings → Ledger. The page opens with the Work ledger title.
- Set the filters: site, Type, Done by (Autopilot, User, Assistant, API / MCP, System) and Period (This month, Last month, Last 30 days, Last 90 days or Custom). Click Apply.
- The table shows each item's date, site, type, evidence (PR, link or post), estimated time, who did it and its impact.
- Click Download CSV to get everything.
Record types: meta fix, technical fix, redirect, structured data, code fix (PR), PR merged, blog post, page update, social post, video, sitemap submission, IndexNow notification, llms.txt, outreach e-mail, ad campaign and manual task.
Estimated times
Each type of work has a minutes coefficient: the average time an expert would need to do it by hand. For example, a meta fix counts as 6 minutes per page, a code fix (PR) as 45 minutes and a blog post as 180 minutes.
- Per type and month, the first 20 items count in full and later ones at half.
- Reverted or failed work doesn't count.
- PR merged and Manual task are recorded as evidence and add no time.
As an Owner or Admin you can change the coefficients in the Time coefficients section on the same page; the change applies to past records too. When Show estimated value is on and you have entered an hourly rate and currency, the estimated time is multiplied by that rate and shown as Estimated value.
Times and value are estimates. They don't show the time you or your team spent, but how long the same work would take by hand.
Measured impact
For work that touches pages (meta, technical and redirect fixes, structured data, merged PRs, blog posts, page updates), the result in Search Console is measured. The site's Search Console property must be connected and have data.
- Before: the 28 days ending the day before the work.
- After: the 28 days starting 7 days after the work (time for Google to recrawl). No result is given until Search Console has complete data for this window; until then you see “waiting” and the expected date.
- Control group: the site's pages no work touched in the same period. The result also shows how the click change of the affected pages differs from the rest of the site, in points.
- If the affected pages had fewer than 50 impressions in the 28 days before the work, it says not enough data.
- Site-wide work (IndexNow, sitemap, llms.txt) isn't measured per page.
- New posts have no before window: their first 28 days after publishing are shown, with the site's change over the same days as context only. With fewer than 10 impressions it says “no impressions yet”.
Results always describe the difference seen “after” the work; search results depend on many factors and a change shouldn't be read as caused by the work alone.
To see a site's work and impact together, open the site from Sites and go to the Impact tab: the chart shows the last 90 days of Search Console clicks with dashed lines on work days, and below it the work of the last 150 days is listed with its impact.
Proof in reports
Reports also include a proof summary of the period. Every number comes from stored data; a section with nothing to show is left out:
- Work done: number of items, estimated time (hours) and Queries in the top 10.
- Work done by type, with links to the evidence (PR, publication, post).
- Impact: work whose measurement window completed in this period, biggest changes first.
- AI search visibility: the share of AI answers to tracked prompts that mention the brand or cite the site.
- Social media and ads: published posts, reach, followers and ad spend.
- Waiting for your approval: tasks, content and posts waiting for the client: Client approval.
- Plan for the next period: work queued in the Autopilot plan.
- Method note and time coefficients: how impact is measured and the minute coefficients used; with estimated value on, the equivalent service value.
FAQ
Why isn't a piece of work in the ledger?
The ledger only records work that was applied and has evidence. A PR that is open but not merged yet shows as Code fix (PR); once merged a separate PR merged record is added. A post still in draft or a task waiting for approval isn't in the ledger.
Why does the impact column say “no Search Console”?
The site's Search Console property isn't connected or has no data. To connect it: Google Search Console.
Related articles
- Reports: shareable reports, the scheduled e-mail and white labelHow to create a shareable SEO report for one site or the whole portfolio, download it as a PDF, send a weekly or monthly report to recipients automatically, and put your company details and own brand on reports.
- Client approval: get the client's sign-off before publishingFor agencies: give someone the Client approver role, turn on Require client approval before publishing, and see how approved posts and page updates go to the client, who approves them or sends them back with a note.
- Code fixes as pull requests: GitHub, GitLab and BitbucketHow to connect the site's code repository on GitHub, GitLab or Bitbucket, how AI fixes are opened as pull requests (merge requests on GitLab), how to review and merge them and how they are verified on the next crawl.
- Otopilot: setup, daily run, brief and plan proposalSet up Otopilot for a site step by step, read the daily run and the daily brief, comment on and approve the plan proposal, and use Full auto and the desktop runner.